ChecklistGuro logo ChecklistGuro Solutions Industries Resources Pricing

Waste Management Equipment Malfunction Checklist

Don't let equipment failures halt your waste management operations! This checklist ensures swift troubleshooting and minimizes downtime with a step-by-step guide for common malfunctions. Recover faster and keep your facility running smoothly.

This Template was installed 4 times.

Initial Assessment

NaN of 10

Gathering initial information and verifying the malfunction.

Equipment ID

Date of Malfunction

Time of Malfunction

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Reported By

Initial Description of Problem

Location of Equipment

Safety Procedures

NaN of 10

Ensuring the area is safe and following lockout/tagout protocols.

Lockout/Tagout Procedures Followed?

Area Marked as Hazardous?

Signature confirming safety check

Ambient Temperature (for certain malfunctions)

Date of Safety Assessment

Equipment Identification

NaN of 10

Confirming the specific equipment model and serial number.

Equipment Type

Manufacturer

Model Number

Serial Number

Asset Tag Number

Year of Manufacture

Visual Inspection

NaN of 10

Checking for obvious damage, leaks, or obstructions.

Equipment Model

Describe any Visible Damage

Check for Leaks (Select all that apply)

Fluid Level (if applicable)

Upload Photo of Damage (Optional)

Condition of Belts/Hoses (Select one)

Basic Troubleshooting

NaN of 10

Performing simple checks like power supply and connections.

Power Status

Voltage Reading (if applicable)

Emergency Stop Engaged?

Check Connections

Notes on Initial Observations

Diagnostic Checks

NaN of 10

Running diagnostic tests and interpreting results.

Error Code (if applicable)

Diagnostic Test 1 Result

Diagnostic Test 2 Result

Voltage Reading (if applicable)

Current Reading (if applicable)

Diagnostic Test Notes

Parts Replacement

NaN of 10

Replacing faulty components and verifying functionality.

Part Replaced (Select One)

Part Description (if 'Other' selected)

Part Quantity

Upload Photo of Replaced Part (Optional)

Part Cost (USD)

Part Source (Supplier)

Notes on Part Condition/Source (if applicable)

Calibration & Testing

NaN of 10

Calibrating equipment and performing functional tests.

Calibration Point 1: Actual Value

Calibration Point 1: Expected Value

Calibration Point 1: Tolerance (Upper Limit)

Calibration Point 1: Tolerance (Lower Limit)

Calibration Point 1: Pass/Fail

Test Result: Measurement 1

Functional Test: Result

Documentation & Reporting

NaN of 10

Recording the malfunction, repair steps, and any recommendations.

Detailed Description of Malfunction

Repair Steps Taken

Estimated Repair Time (Minutes)

Date of Repair

Time of Repair

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Parts Used (if any)

Additional Notes / Recommendations

Technician Signature

Final Verification & Handover

NaN of 10

Confirming the equipment is operating correctly and handing it back to the user.

Technician Signature

Date of Handover

Time of Handover

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Equipment Operational Status (1-5, 5 being optimal)

Any remaining recommendations or notes

User acceptance of equipment?

Equipment Location Post-Repair

We can do it Together

Need help with Checklists?

Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.

Email Address
How can we help?