Excavation Safety Plan Checklist

Ensure worker safety and regulatory compliance with our comprehensive Excavation Safety Plan Checklist! This essential construction checklist covers shoring, sloping, atmospheric testing, and more - helping you avoid costly fines and protect your team. Download now for a safer worksite!

This Template was installed 2 times.

Site Assessment & Planning

1 of 10

Initial evaluation of the excavation site and development of a comprehensive safety plan.

Brief Site Description

Maximum Excavation Depth (feet)

Date of Site Assessment

GPS Coordinates of Excavation Site

Soil Type (Preliminary)

Potential Hazards Observed During Assessment (e.g., nearby structures, traffic)

Proximity to Structures/Utilities?

Site Map/Diagram (showing dimensions, utilities)

Underground Utility Location

2 of 10

Identification and marking of all underground utilities prior to excavation.

Describe the process used to locate underground utilities.

Which utility locating methods were employed?

Upload copies of utility locating requests and responses.

Document any discrepancies found between utility maps and actual locations.

Mark the precise location of utility markings on a site map.

Date of utility location verification.

Competent Person Inspection & Classification

3 of 10

Verification that a competent person has inspected and classified the soil for stability.

Date of Inspection

Name of Competent Person

Title/Role of Competent Person

Soil Type Classification (e.g., Type A, Type B, Type C)

Maximum Allowable Slope Angle (Degrees)

Shoring Depth (Feet)

Detailed Observations & Recommendations

Potential Hazards Identified

Competent Person Signature

Protective Systems & Sloping/Benching

4 of 10

Details regarding protective systems like sloping, benching, shoring, or trench boxes.

Maximum allowable slope angle (degrees)

Description of the sloped/benched system design (including details of benches, steps, or terraces)

Bench Height (feet)

Bench Width (feet)

Soil Stabilization Methods Employed (check all that apply)

Detailed explanation of how soil stability is maintained throughout the excavation process.

Type of Protection System Used (if not sloped/benched)

Explanation of calculations performed to ensure slope stability.

Trench Box / Shielding Installation

5 of 10

Specific requirements and inspections related to trench box or shielding installation and usage.

Trencher Box/Shielding Serial Number

Trencher Box/Shielding Condition Upon Arrival

Description of any observed damage or defects

Competent Person Verification of Structural Integrity

Depth of Shielding / Box (ft)

Shielding/Box Overlap (minimum 2ft)

Date of Last Inspection/Certification

Signature of Competent Person Verifying Installation

Access & Egress

6 of 10

Ensuring safe access and egress from the excavation, including ladders, ramps, or other methods.

Maximum Vertical Depth of Excavation (ft)

Approved Access/Egress Methods:

If 'Other' selected for Access/Egress method, please specify:

Number of Ladders/Ramps/Stairways Provided

Ladder Material (if applicable)

Description of any deviations from standard access/egress requirements:

Date of last Access/Egress inspection

Inspector Signature - Access/Egress

Water Accumulation & Control

7 of 10

Planning for and controlling water accumulation in the excavation.

Describe the anticipated sources of water inflow (e.g., groundwater, surface runoff, precipitation).

Method(s) for water control:

Estimated pumping rate (gallons per minute or liters per minute)

Describe the pump capacity and type of pump to be used.

Backup power source for dewatering pumps:

Describe the procedure for monitoring water levels during excavation.

Atmospheric Hazards

8 of 10

Addressing potential atmospheric hazards such as oxygen deficiency or hazardous gases.

Potential Atmospheric Hazards Identified?

Atmospheric Monitoring Required? (Select all that apply)

Minimum Acceptable Oxygen Level (%)

Maximum Acceptable Concentration of Toxic Gases (ppm)

Monitoring Equipment Calibration Records

Ventilation Required?

Ventilation Plan Details

Date of Last Atmospheric Hazard Assessment

Soil Management & Material Storage

9 of 10

Safe storage and handling of excavated soil and other materials.

Describe the designated areas for soil and material storage.

Minimum Safe Distance from Edge of Excavation for Material Storage (feet)

Methods for Stabilizing Soil Piles to Prevent Collapse (Select all that apply)

Method used for preventing soil erosion from stockpiles.

Date of Last Soil Pile Stability Inspection

Name of Person Performing Last Soil Pile Stability Inspection

Upload Photos of Soil Storage Areas (showing stability measures)

Communication & Emergency Procedures

10 of 10

Establishing clear communication protocols and emergency response plans.

Emergency Contact List (including phone numbers)

Emergency Callout Sequence (Priority Order)

Potential Emergency Scenarios Addressed in Plan (Check all that apply)

Description of Emergency Evacuation Route(s)

Date of Last Emergency Drill

Scheduled Time for Regular Safety Briefings

Communication Procedures for Reporting Near Misses/Incidents

Primary Communication Method on Site (e.g., Radio, Whistle, Hand Signals)

Construction Management Solution Screen Recording

See how ChecklistGuro can transform your construction management! This screen recording showcases our BPM solution in action, streamlining workflows, boosting efficiency, and keeping your projects on track. Discover how easy it is to manage tasks, approvals, and more. #constructionmanagement #bpm #checklistguro #screenrecording #projectmanagement #constructiontech #workflowautomation

Related Checklist Templates

We can do it Together

Need help with Checklists?

Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.

Email Address
How can we help?