ChecklistGuro logo ChecklistGuro Solutions Industries Resources Pricing

MRP Inventory Control Checklist

Ensure accurate inventory levels, minimize stockouts, and optimize warehouse efficiency with our MRP Inventory Control Checklist. This essential template guides you through key steps for managing material availability, reducing waste, and strengthening your supply chain - all vital for a successful Material Requirements Planning (MRP) system.

This Template was installed 0 times.

Inventory Accuracy Verification

1 of 8

Ensuring on-hand quantities match system records.

Physical Inventory Count Variance (%)

Last Physical Inventory Date

Location of Physical Count

Number of Discrepancies Found

Description of Significant Discrepancies

Root Cause Analysis Performed?

Date of Next Scheduled Inventory Accuracy Check

Safety Stock Level Review

2 of 8

Assessing and adjusting safety stock levels to optimize service and cost.

Current Safety Stock Level (Item A)

Average Daily Demand (Item A)

Lead Time (Days) (Item A)

Service Level Target (%)

Rationale for Safety Stock Adjustment (Item A)

Safety Stock Calculation Method

Last Safety Stock Review Date

Proposed New Safety Stock Level (Item A)

Cycle Count Procedures

3 of 8

Validating and improving cycle counting processes.

Cycle Count Frequency (Days)

Cycle Count Method

Cycle Count Procedure Documentation

Target Count Accuracy (%)

Last Cycle Count Review Date

Items Included in Cycle Count (Sample)

Deviation Handling Process

Cycle Counter Signature

Obsolete Inventory Management

4 of 8

Identifying and disposing of obsolete or slow-moving inventory.

Estimated Quantity of Obsolete Inventory

Description of Obsolete Inventory

Date Inventory Became Obsolete

Reason for Inventory Obsolescence

Proposed Disposition Method

Notes/Comments on Disposition

Target Disposal Date

Lot Traceability Validation

5 of 8

Confirming the effectiveness of lot traceability systems.

Lot Number Start Range

Lot Number End Range

Last Traceability Test Date

Traceability Test Procedure Description

Traceability Test Report

Verification Method

Traceability Test Location

Tester Signature

Inventory Aging Analysis

6 of 8

Analyzing inventory age to identify potential issues and inefficiencies.

Number of Days Inventory has Aged

Percentage of Inventory > 90 Days Old

Percentage of Inventory > 180 Days Old

Root Cause Analysis Category

Last Review Date

Action Plan & Notes

Value of Inventory > 180 Days

Warehouse Layout and Efficiency

7 of 8

Evaluating warehouse layout and processes for optimal material flow.

Average Picking Time (minutes)

Warehouse Utilization Rate (%)

Description of Current Aisles and Flow

Material Handling Equipment Used

High-Throughput Zones Identified

Proposed Layout Improvements

Walking Distance for Common Tasks (feet)

Inventory Record Reconciliation

8 of 8

Regular reconciliation of inventory records with physical counts.

Reconciliation Date

Beginning Inventory Count

Ending Inventory Count

Received Quantity

Issued Quantity

Adjustments (if any)

Explanation for Discrepancies (if any)

Prepared By

Material Requirements Planning (MRP) Screen Recording

Learn how to effectively manage your inventory and production with ChecklistGuro's Material Requirements Planning (MRP) functionality! This screen recording demonstrates how to use MRP to calculate material needs, plan production schedules, and ensure you always have the right materials on hand. Stop overstocking or facing stockouts - watch to see MRP in action! #MRP #MaterialRequirementsPlanning #InventoryManagement #ProductionPlanning #ChecklistGuro #BPM

Related Checklist Templates

We can do it Together

Need help with Checklists?

Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.

Email Address
How can we help?