MRP Work Order Management Checklist
Ensure smooth production & minimize delays! This MRP Work Order Management Checklist guides you through every step-from creation & release to completion & analysis-for optimized workflows & efficient resource utilization. Download now & streamline your MRP processes.
This Template was installed 0 times.
Work Order Creation
Ensuring accurate and complete work order initiation.
Work Order Number
Planned Start Date
Planned Completion Date
Product Type
Quantity to Produce
Special Instructions
Production Line
Material Allocation
Verifying correct material assignment to work orders.
Material Source
Quantity Allocated
Reserved Quantity
Allocation Notes
Allocation Date
Lot/Serial Tracking?
Routing and Operations
Confirming correct routing and operation sequencing.
Operation Description
Setup Time (Minutes)
Run Time (Minutes)
Machine Speed (%)
Work Center
Required Tools
Planned Start Date
Labor Assignment
Validating accurate labor assignment to work orders.
Labor Category
Standard Labor Hours
Actual Labor Hours
Employee Skill Level
Labor Start Date
Labor Start Time
Shop Floor Data Collection
Checking for proper recording of production progress.
Quantity Started
Quantity Completed
Start Time
End Time
Comments/Notes
Operator Signature
Work Station Location
Work Order Status Updates
Ensuring timely and accurate status updates.
Planned Start Date
Planned Start Time
Actual Start Date
Actual Start Time
Current Status
Status Update Notes
Percentage Complete (%)
Estimated Completion Date
Variance Analysis
Reviewing and analyzing variances from planned work orders.
Material Usage Variance (Quantity)
Material Cost Variance
Labor Hours Variance
Labor Cost Variance
Variance Explanation
Variance Type (Favorable/Unfavorable)
Variance Recorded Date
Reviewer Signature
Work Order Closure
Confirming complete and accurate work order closure procedures.
Actual Completion Date
Actual Labor Hours
Actual Material Usage
Notes on Completion (e.g., rework, issues)
Production Supervisor Signature
Quality Control Status
Supporting Documentation (Photos, QC Reports)
Inventory Reconciliation
Verifying inventory accuracy after work order completion.
Actual Inventory Count
System Inventory Record
Inventory Variance (Positive/Negative)
Variance Explanation
Possible Causes (select all that apply)
Reconciliation Date
Inventory Control Signature
Reporting & Analysis
Reviewing key metrics and identifying areas for improvement.
Work Order Completion Rate (%)
Material Usage Variance (%)
Labor Hours Variance (Hours)
Report Generation Date
Reporting Period
Summary of Findings
Areas Requiring Further Investigation
Material Requirements Planning (MRP) Screen Recording
Learn how to effectively manage your inventory and production with ChecklistGuro's Material Requirements Planning (MRP) functionality! This screen recording demonstrates how to use MRP to calculate material needs, plan production schedules, and ensure you always have the right materials on hand. Stop overstocking or facing stockouts - watch to see MRP in action! #MRP #MaterialRequirementsPlanning #InventoryManagement #ProductionPlanning #ChecklistGuro #BPM
Related Checklist Templates
We can do it Together
Need help with Checklists?
Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.







