MRP Lead Time Review Checklist

Don't let inaccurate lead times derail your MRP! This MRP Lead Time Review Checklist ensures data accuracy, minimizes stockouts, and optimizes production scheduling. Streamline your planning process and boost efficiency with this essential tool.

This Template was installed 0 times.

Lead Time Data Accuracy

1 of 9

Verify the accuracy of all lead time data entered into the MRP system. Includes supplier lead times, internal processing times, and transportation times.

Supplier Lead Time (Days)

Internal Processing Time (Hours)

Transportation Lead Time (Days)

Last Lead Time Update Date

Notes on Lead Time Variability

Unit of Measure (Lead Time)

Lead Time Calculation Methods

2 of 9

Review the methods used to calculate lead times. Ensure they are consistent and appropriate for different materials and processes.

Describe the primary method used for lead time calculation (e.g., average, weighted average, historical data analysis).

What weighting factor is applied to historical data (if applicable)?

Which data sources are used to determine lead times?

Date of last review and adjustment of the lead time calculation method.

Explain any variations in calculation methods used for different material categories or suppliers.

Supplier Communication & Updates

3 of 9

Assess the process for receiving and incorporating lead time updates from suppliers. Verify communication channels and frequency.

Frequency of Supplier Lead Time Updates (Weeks)

Communication Method for Lead Time Updates

Date of Last Supplier Lead Time Confirmation

Notes from Last Supplier Communication (e.g., known delays, significant changes)

Supplier Contact Person Verified?

Attach Supplier Lead Time Confirmation Document (if applicable)

Internal Processing Time Validation

4 of 9

Validate the accuracy of internal processing times for each operation. Consider factors like machine setup, inspection, and quality control.

Setup Time (Minutes)

Processing Time per Unit (Minutes)

Inspection Time (Minutes)

Wait Time between Operations (Minutes)

Equipment Used

Notes/Observations Regarding Time

Date of Last Time Study

Transportation Lead Time Review

5 of 9

Evaluate transportation lead times, including potential delays and variability. Factor in customs clearance and port congestion (if applicable).

Average Transit Time (Days)

Transit Time Variability (Days)

Primary Carrier

Last Transit Time Review Date

Notes on Recent Transit Disruptions (e.g., weather, port congestion)

Potential Risks/Delays

Origin Location (e.g., Supplier Address)

Safety Stock Considerations

6 of 9

Assess how lead time variability impacts safety stock levels and ensure adequate coverage.

Current Safety Stock Level

Lead Time Variability (Days)

Service Level Target (%)

Rationale for Current Safety Stock Levels

Impact of Stockout (High/Medium/Low)

Cost of Holding One Unit (USD)

Cost of One Stockout (USD)

System Integration Checks

7 of 9

Verify that lead time data is correctly synchronized between the MRP system and other relevant systems (e.g., procurement, warehouse management).

Synchronization Frequency (hours)

Integration Point 1 Status

Error Logs (if applicable)

Data Consistency Check Result

Last Integration Sync Date

Systems Integrated

Documentation & Approval

8 of 9

Ensure all lead time data and changes are properly documented and approved by relevant personnel.

Description of Lead Time Changes

Date of Lead Time Change Request

Requesting Department

Requester Signature

Approver Signature

Revision Number

Periodic Review & Updates

9 of 9

Establish a schedule for periodic review and updates of lead time data to account for changing conditions.

Last Review Date

Review Frequency (in months)

Summary of Review Findings

Areas Updated/Adjusted

Reviewer Signature

Material Requirements Planning (MRP) Screen Recording

Learn how to effectively manage your inventory and production with ChecklistGuro's Material Requirements Planning (MRP) functionality! This screen recording demonstrates how to use MRP to calculate material needs, plan production schedules, and ensure you always have the right materials on hand. Stop overstocking or facing stockouts - watch to see MRP in action! #MRP #MaterialRequirementsPlanning #InventoryManagement #ProductionPlanning #ChecklistGuro #BPM

Related Checklist Templates

We can do it Together

Need help with Checklists?

Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.

Email Address
How can we help?