MRP System Go-Live Checklist
Ensure a smooth and successful MRP system launch! Our MRP Go-Live Checklist guides you through critical pre-launch tasks, data validation, user training, and post-implementation monitoring, minimizing disruption and maximizing ROI. Download now and confidently transition to efficient material planning.
This Template was installed 0 times.
Pre-Go-Live Data Validation
Ensuring data accuracy and completeness before the system goes live.
Bill of Materials (BOM) Record Count
Item Master Record Count
Vendor Master Record Count
Customer Master Record Count
Data Validation Discrepancies Log
BOM Accuracy Verified?
Item Master Accuracy Verified?
Data Validation Completion Date
System Configuration Verification
Confirming all system parameters and settings are correctly configured.
Safety Stock Levels Verified
Lot Size Calculation Method
Lead Time Days
Last Parameter Update Date
Activated MRP Modules
Notes/Comments on Configuration
User Training & Access
Validating user training completion and access rights assignment.
Number of Users Trained
Training Delivery Method
Training Completion Deadline
Training Modules Covered
Trainer Qualification
Training Feedback Summary
Infrastructure Readiness
Checking server, network, and hardware requirements are met.
Server CPU Utilization (%)
Server RAM Utilization (%)
Disk Space Available (GB)
Network Connectivity Status
Last Server Maintenance Date
Notes on any identified Infrastructure Risks
Screenshot of Server Performance Metrics
Integration Testing
Testing data flow and functionality with connected systems.
Integration Point 1: ERP System
Number of Records Transferred (Test)
Last Integration Test Run Date
Integration Test Results Summary
Integration Point 2: WMS (Warehouse Management System)
Data Transfer Error Count
Detailed Error Log (If Applicable)
Cutover Planning & Execution
Reviewing and executing the cutover plan from legacy to new system.
Planned Cutover Start Date
Planned Cutover Start Time
Detailed Cutover Plan Description
Estimated Downtime (in hours)
Data Migration Tasks Completed
Cutover Runbook
Data Validation Method
Cutover Plan Approval
Go-Live Support & Monitoring
Establishing support procedures and monitoring system performance post-go-live.
Scheduled Go-Live Time
Number of Support Staff Available
Critical System Modules to Monitor
Escalation Procedures Summary
Scheduled Support End Date
Primary Support Contact
Post-Go-Live Stabilization
Addressing initial issues and optimizing system performance in the days following go-live.
Number of Critical Errors Reported (Day 1)
Average Transaction Processing Time (vs. Legacy)
Functional Areas Experiencing Issues
Description of Major Issues Encountered
Date of First Issue Resolution
Time of First Issue Resolution
Overall System Stability Assessment (1-5, 5 being excellent)
Documentation & Handover
Ensuring proper documentation and knowledge transfer to support teams.
Knowledge Transfer Plan Summary
System Administration Manual
User Training Materials
Number of Trained Support Staff
Knowledge Transfer Completion Date
Sign-off from Key Stakeholders
Documentation Delivered (Select all that apply)
Material Requirements Planning (MRP) Screen Recording
Learn how to effectively manage your inventory and production with ChecklistGuro's Material Requirements Planning (MRP) functionality! This screen recording demonstrates how to use MRP to calculate material needs, plan production schedules, and ensure you always have the right materials on hand. Stop overstocking or facing stockouts - watch to see MRP in action! #MRP #MaterialRequirementsPlanning #InventoryManagement #ProductionPlanning #ChecklistGuro #BPM
Related Checklist Templates
We can do it Together
Need help with Checklists?
Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.